Stop losing margin to assumptions
nobody wrote down.
Practical frameworks for estimating, site management, and project management. Built from 30 years of construction experience — and tested on real projects.
Site Risk Visibility Tool
Making risk explicit — without slowing the job down. A structured field tool for superintendents and site teams to surface risk in the moment, before it becomes a change order or a cost overrun.
Used by site teams to catch risk before it becomes a claim.
Download Free →Frameworks that reduce margin erosion.
Each tool is built around a specific decision point where construction projects quietly lose money.
Not right for you? trish@construction-explained.com
Estimating Risk Checklist
A structured pre-submission checklist that surfaces assumptions, incomplete information, and pricing risk before the bid goes out.
- ✓8 risk categories: scope, labour, procurement, contingency
- ✓Designed for commercial and institutional bids
- ✓Printable one-page format
Pre-Tender Review Worksheet
A structured review framework for identifying risk exposure before committing to a tender. Covers drawings, scope gaps, assumptions, and decision points.
- ✓Structured for use before bid submission
- ✓Identifies scope gaps and unpriced risk
- ✓One-page format for team review
Change Order Defense Template
A structured template for documenting and defending change orders — built to support clear communication with owners and reduce dispute risk.
- ✓Clear structure for cost and time impact
- ✓Defensible documentation format
- ✓Reduces back-and-forth on claims
30-Day PM Clarity Framework
A structured four-week framework for project managers taking over a new project. Covers contract review, site alignment, commercial control, and forward visibility.
- ✓Week-by-week structure for first 30 days
- ✓Covers contract, site, cost, and risk
- ✓Ends with a clear forward visibility question
Risk Register with Formulas
A working Excel risk register with built-in probability and impact formulas. Designed for active use on commercial projects to track, score, and manage risk exposure in real time.
- ✓Probability × impact scoring built in
- ✓Tracks risk owner, status, and mitigation
- ✓Ready to use on day one — no setup required
One complete system.
Four tools. One price.
Four tools covering the full project lifecycle — from estimating risk through site execution to financial control. Everything a PM or senior estimator needs, without buying four times.
- ✓All four tools — $245 individual value
- ✓Covers estimating, site, and PM
- ✓Immediate download after purchase
- ✓PDF, Word & Excel formats included
Not the right fit?
trish@construction-explained.com
“These tools have everything I need to run my projects.”
Senior PMA new framework published every week.
Each Wednesday a new video drops on YouTube and LinkedIn — covering a specific risk, tool, or decision point from the field.